ACME Solar signs 25-year PPA with SECI for 190 MW hybrid power project

The project entails supplying hybrid power with a minimum annual Capacity Utilisation Factor (CUF) of 50 per cent and meeting 80 per cent of daily peak power requirements.

Feb 20, 2026 - 00:30
 0
ACME Solar signs 25-year PPA with SECI for 190 MW hybrid power project
The project entails supplying hybrid power with a minimum annual Capacity Utilisation Factor (CUF) of 50 per cent and meeting 80 per cent of daily peak power requirements.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow