NTPC REL begins commercial supply of 37.50 MW from Sadla solar project

With this, the total installed and commercial capacity of the NTPC group has now become 76,598.18 MW, the NTPC stated in a regulatory filing.

Dec 28, 2024 - 07:30
 0
NTPC REL begins commercial supply of 37.50 MW from Sadla solar project
With this, the total installed and commercial capacity of the NTPC group has now become 76,598.18 MW, the NTPC stated in a regulatory filing.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow