L&T wins order to build 116 MW solar project with 241 MWh battery system in Bihar

The engineering, procurement and construction (EPC) order takes the total co-located storage capacity of the Lakhisarai renewable generation site to 495 MWh.

Aug 5, 2025 - 07:30
 0
L&T wins order to build 116 MW solar project with 241 MWh battery system in Bihar
The engineering, procurement and construction (EPC) order takes the total co-located storage capacity of the Lakhisarai renewable generation site to 495 MWh.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow