NTPC Green Energy adds 14.43 MW to Khavda-I solar project
The newly commissioned unit is the eleventh part of the project being developed under the CPSU Scheme Phase-II Tranche-III by NTPC Renewable Energy Limited.
The newly commissioned unit is the eleventh part of the project being developed under the CPSU Scheme Phase-II Tranche-III by NTPC Renewable Energy Limited.